Header image  
A Charley Morgan Design  
line decor
  HOME  ::  
line decor
 

Accolade Re-fit
03/31/2012

Centerboard Sheeve Box Replacement

The main job was to replace the old centerboard mechanism. Everything in the bilge was rotted out, including the centerboard lift. I think many WI36 owners can profit from it. We had a new pully fabricated. It's all stainless. The material including bolts was about $110, and the welding about $160. The old system was only held by 2 rusty bolts (lucky us she didn't sink!!). There was always salt water in the bilge, so the SS pipe had pi holes, and water would get in the bilge.

 


 
Accolade's Refit
small product photo      
New Centerboard Bushing  

Engine Access

  Poly Fuel Tank  
 
     
Sheeve Box Replacement